Recommendation Contents
OIG recommends that the Bureau of Overseas Buildings Operations (OBO) review all active construction contracts that were awarded prior to the 2015 and 2016 Construction Alerts to determine whether they have been modified to require Integrated Systems Tests. If not, OBO should ensure that the contracts are modified to include them.
